Much improved punctuality
Modern control solutions, this show many examples of
practice which can dramatically increase security planning
and provide transparency in manufacturing. But there are
other advantages: With
ProXIA
improved significantly using the machines, and recoverable
as less downtime.
ProXIA
provides the planner the answers to his "what if" questions
and this "Just in Time". Thus, the planner reliable
information to the right decisions.
This pushes the cost down and demonstrably reduces the
throughput. Thanks to the transparent design also reduces
the stock of halftime-products and thus the capital
commitment. Another effect that is optimized by a detailed
reached, shorter delivery times and a much improved
punctuality - a particularly topical significant competitive
advantage.
Shared Access to Data
ProXIA
has numerous ERP / PPC systems such as SAP, Infor and
Microsoft Dyna-mics over a bidirectional interface, and is
usually combined with an MES / BDE / MDE / PZE system
(collection of operational data, machine data, staff time)
operated, ideally with the COSCOM COMU solution. Operations
of this system in
ProXIA
by altering the graphic representation immediately.
ProXIA
working with master data in a central database, managed,
and on the other applications can access. That is, among
other things for users learned that the systems already in
use COSCOM process have.
ProXIA
adds here free interface and works with the same data.
Independent Sector
Basically whatever is applicable
ProXIA
industry and is suitable for both serial and variant
production as well as for order-related production. The
potential savings associated with
ProXIA
in detailed planning can be developed, are enormous. COSCOM
When one speaks of a payback period after commissioning of
less than twelve months.
the most important functions of ProXIA:
| bi-directional ERP/PPS interfaces | |||
| machine scheluding | |||
| simulations assistant | |||
| incorporating transport / lay times | |||
| material availability planning | |||
| planning of order networks | |||
| capacity utilization across a scalable area | |||
| planning against machine capacity/utilization coefficient |